Netzwerkbogenbrücken der ÖBB über den Zentralverschiebebahnhof Wien-Kledering, Österreich - Statisch konstruktive Planung der Brücken
Author(s): |
Manfred Heinlein
Oliver Einhäuser |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, May 2013, n. 5, v. 82 |
Page(s): | 334-339 |
DOI: | 10.1002/stab.201310046 |
Abstract: |
Network arch bridges for the ÖBB over the central marshalling yard at Vienna-Kledering, Austria - Structural and constructional design of the bridges.To connect Vienna International Airport at Schwechat with the new Main Railway Station a chain of bridges must be erected over the central marshalling yard. The centrepiece of this chain of bridges is formed by two network arch bridges with spans of 112.50 m and 88.50 m. |
Keywords: |
hangers railroad bridge rail bridge hanger net network of hangers weld shrinkage arch shape
|
Available from: | Refer to publisher |
Structures and Projects
Structure Types
- About this
data sheet - Reference-ID
10069704 - Published on:
20/01/2014 - Last updated on:
13/08/2014