Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method
Author(s): |
Hosang Hyun
Minhyuk Jung Inseok Yoon Hyun-Soo Lee Jeonghoon Lee |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Asian Architecture and Building Engineering, October 2020, n. 3, v. 20 |
Page(s): | 1-13 |
DOI: | 10.1080/13467581.2020.1782917 |
- About this
data sheet - Reference-ID
10427006 - Published on:
13/07/2020 - Last updated on:
11/04/2021