Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms
Author(s): |
Jeonghoon Lee
Hosang Hyun |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2019, n. 1, v. 145 |
Page(s): | 04018116 |
DOI: | 10.1061/(asce)co.1943-7862.0001585 |
- About this
data sheet - Reference-ID
10218578 - Published on:
01/11/2018 - Last updated on:
01/11/2018