Multi-objective optimization of lean-based repetitive scheduling using batch and pull production
Author(s): |
Dina A. Saad
Mohamed Masoud Hesham Osman |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, July 2021, v. 127 |
Page(s): | 103696 |
DOI: | 10.1016/j.autcon.2021.103696 |
- About this
data sheet - Reference-ID
10601962 - Published on:
17/04/2021 - Last updated on:
17/04/2021