A multi-objective DCP model for bi-level resource-constrained project scheduling problems in grounding grid system project under hybrid uncertainty
Author(s): |
Zhe Zhang
Ming Liu Xiaoyang Zhou Lu Chen |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | KSCE Journal of Civil Engineering, October 2015, n. 5, v. 20 |
Page(s): | 1631-1641 |
DOI: | 10.1007/s12205-015-0615-6 |