0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001593.
  • About this
    data sheet
  • Reference-ID
    10222840
  • Published on:
    01/12/2018
  • Last updated on:
    01/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine