0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelos matemáticos para la resolución del problema de dimensionado de buffers en líneas de montaje en paralelo con estaciones multilínea y tiempos de ciclo diferentes

Author(s):
ORCID
ORCID
Medium: journal article
Language(s): Spanish
Published in: DYNA, , n. 6, v. 96
Page(s): 563
DOI: 10.6036/10223
Abstract:

In industry there are production systems consisting of more than one assembly line. If these are close together, it is possible for an operator to perform tasks from two adjacent lines assigned to his station (this will be a "multi-line station")

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.6036/10223.
  • About this
    data sheet
  • Reference-ID
    10641209
  • Published on:
    30/11/2021
  • Last updated on:
    30/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine