0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelling completion risk using stochastic critical path‐envelope method: a BOT highway project application

This publication has been cited in the following 4 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10207333
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine