0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelling and mitigating lifetime impact of building demand responsive control of heating, ventilation and air-conditioning systems

Author(s):


Medium: journal article
Language(s): English
Published in: Journal of Building Performance Simulation, , n. 6, v. 15
Page(s): 771-787
DOI: 10.1080/19401493.2022.2094466
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/19401493.2022.2094466.
  • About this
    data sheet
  • Reference-ID
    10689706
  • Published on:
    13/08/2022
  • Last updated on:
    13/08/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine