Modeling Worker Competence to Advance Precast Production Scheduling Optimization
Author(s): |
Zhaojing Wang
Hao Hu Jie Gong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, November 2018, n. 11, v. 144 |
Page(s): | 04018098 |
DOI: | 10.1061/(asce)co.1943-7862.0001556 |
- About this
data sheet - Reference-ID
10174874 - Published on:
11/12/2018 - Last updated on:
11/12/2018