0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects

This publication lists 90 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10760379
  • Published on:
    15/03/2024
  • Last updated on:
    25/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine