A model for work packages optimization in results-based-finance projects
Author(s): |
Amira Shalaby
A. Samer Ezeldin |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, July 2021, n. 7, v. 29 |
Page(s): | 2810-2835 |
DOI: | 10.1108/ecam-10-2019-0556 |
- About this
data sheet - Reference-ID
10614031 - Published on:
09/07/2021 - Last updated on:
13/08/2022