0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Model for Preparing Optimal Contracts to Prevent or Reduce Claims in Projects

Author(s): (Associate Professor of Project and Construction Management, School of Architecture, College of Fine Arts, Univ. of Tehran, Tehran 1417466191, Iran.)
ORCID (Master of Project and Construction Management, School of Architecture, College of Fine Arts, Univ. of Tehran, Tehran 1417466191, Iran (corresponding author))
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 2, v. 12
Page(s): 04520004
DOI: 10.1061/(asce)la.1943-4170.0000363
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000363.
  • About this
    data sheet
  • Reference-ID
    10580001
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine