Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM
Author(s): |
Guofeng Ma
Xiaoye Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Advances in Civil Engineering, January 2020, v. 2020 |
Page(s): | 1-14 |
DOI: | 10.1155/2020/9727256 |
Abstract: |
The project duration can be shortened by overlapping construction activities. However, the continuous changing of the environment tends to cause problems such as rework and the failure of the overlapping plan. In order to solve these problems, communication strategies for the overlapping of dependent activities are first introduced and optimized from a revenue perspective. We first consider the different maturities of upstream activity before and after the overlapping, the downstream sensitivity which is decided by involving communication strategies, and the learning and error-correcting ability of workers. Then, the overlap and communication strategies are decided by calculating the maximum revenue using Monte Carlo simulation and MATLAB based on overlap cost, communication cost, rework cost, and reward amount. Finally, the algorithm and BIM are combined to provide a visual overlap plan and dynamic control platform framework. This research is valuable for practitioners as it provides a dynamic overlap plan which can maximize the revenue in changing the environment and ensure the duration of the project. This research also provides researchers a new insight into combining overlap problems and BIM technology. |
Copyright: | © Guofeng Ma and Xiaoye Liu et al. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.99 MB
- About this
data sheet - Reference-ID
10433981 - Published on:
11/09/2020 - Last updated on:
02/06/2021