0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mitigating construction delays in Indian real estate projects through effective organizational and project management

Author(s): ORCID
Medium: journal article
Language(s): English
Published in: International Journal of Building Pathology and Adaptation
DOI: 10.1108/ijbpa-08-2023-0109
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ijbpa-08-2023-0109.
  • About this
    data sheet
  • Reference-ID
    10755102
  • Published on:
    14/01/2024
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine