Minimum Moment Method for Resource Leveling Using Entropy Maximization
Author(s): |
Symeon E. Christodoulou
Georgios Ellinas Anastasia Michaelidou-Kamenou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, May 2010, n. 5, v. 136 |
Page(s): | 518-527 |
DOI: | 10.1061/(asce)co.1943-7862.0000149 |
- About this
data sheet - Reference-ID
10165839 - Published on:
11/12/2018 - Last updated on:
11/12/2018