0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Metro mover

Rapid erection of spans helped contractors on one of Santiago's new metro lines meet a demanding schedule

Medium: journal article
Language(s): English
Published in: Bridge Design & Engineering, , n. 38, v. 11
Page(s): 34

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10017087
  • Published on:
    07/03/2005
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine