0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Methods of Synthesis of Technical and Organisational-Technological Solutions in Construction/Synthesemethoden der technischen und organisatorisch-technologischen lösungen im bauwesen

Author(s):

Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 4, v. 5
Page(s): 285-289
DOI: 10.3846/13921525.1999.10531476
Abstract:

Quite frequently one has to solve variant synthesis multicriterial selection problems in construction. These problems consist of many technical-organisational solutions interacting with each other. The solution of each problem can be made of two or more alternatives. In each step k according to j, the effectiveness criterion is selected from variants i. Using the entropy method the weights of effectiveness indices in each step are calculated. By the criterion k(1) the effectiveness of variants in each step is determined. From the row of priorities obtained the first two variants are selected and they are repeatedly calculated by the same methods. The selection of variants (branches) synthesised is made by the criterion Ωs (2). A priority row of variants is determined according to the rule that the greater value of Ωsmeans the best variant (3). The second algorithm is used when there are more than two variants in the steps of problem. A joint matrix between separate steps of solutions is determined. Weights of criteria for each step are determined using the entropy method. It is necessary to regulate the values of importance according the number of variants. The weights obtained by the method of entropy are multiplied by the coefficient considering the number of alternatives analysed (4). The final valuation of branch is obtained according to the formula No 5. The best synthesis result is the one, having the largest Ωs value. The values of criteria effectiveness of each step of each net program branch are summed, when priorities are determined using the same coefficients of effectiveness. The weights are summed using formula 6. It is possible to calculate the priorities of alternatives using the ideal point method. The methods mentioned above were used to solve real life construction problems.

Copyright: © 1999 The Author(s). Published by VGTU Press.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10363776
  • Published on:
    12/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine