Methods of re-mining tunnel T08 at THSRC contract C230 after a collapse
Author(s): |
J. K. Kim
G. B. Hemphill W. Stewart J. Tinkler |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, May 2006, n. 3-4, v. 21 |
Page(s): | 320 |
DOI: | 10.1016/j.tust.2005.12.035 |
Structures and Projects
- About this
data sheet - Reference-ID
10132904 - Published on:
07/12/2018 - Last updated on:
07/12/2018