Methods of Allocation of Task Teams to the Planned Works
Author(s): |
T. Kasprowicz
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Archives of Civil Engineering, June 2019, n. 2, v. 65 |
Page(s): | 91-105 |
DOI: | 10.2478/ace-2019-0021 |
Abstract: |
Small construction objects are often built by standard task teams. The problem is, how to allocate these teams to individual works? To solve the problem of allocation three methods have been developed. The first method allows to designate optimal allocation of teams to the individual works in deterministic conditions of implementation. As a criterion of the optimal allocation can be applied: “the minimization of time” or “the minimization of costs” of works execution. The second method has been developed analogously for both criteria but for stochastic conditions and for the stochastic data. The third method allows to appoint a compromise allocation of teams. In this case, the criteria “the minimization of time” and “the minimization of costs” are considered simultaneously. The method can be applied in deterministic or stochastic conditions of works implementation. The solutions of the allocation problems which have been described allow to designate the optimal allocation of task teams and to determine the schedule and cost of works execution. |
- About this
data sheet - Reference-ID
10378752 - Published on:
10/11/2019 - Last updated on:
10/11/2019