Methods for Selecting the Best Partner Construction Enterprise in Terms of Partnering Relations
Author(s): |
Elżbieta Radziszewska-Zielina
|
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, December 2010, n. 4, v. 16 |
Page(s): | 510-520 |
DOI: | 10.3846/jcem.2010.57 |
Abstract: |
The author proposes fourteen parameters for assessing partnering relations in construction enterprises. By means of these parameters, experts in construction enterprises apply a five‐point scale in order to evaluate enterprise relations with four transactors within its microenvironment. The parameters describing relationships are adopted as assessment criteria. The question of selecting the best construction enterprise for cooperation is a multi‐criteria issue. The author's solution is based on the ELECTRE III method and elaborates two alternative methods of selecting the best construction enterprise on the basis of the analysis of partnering relations between construction enterprises being studied and their transactors within the microenvironment and indicates one of the above introduced methods as preference. Two methods have been developed with a view to supporting a decision‐making system in a construction enterprise as regards the choice of a subcontractor. Relevant calculations can be made by the enterprise decision‐maker using the ConRel programme elaborated by the Cracow University of Technology. Santrauka Siūloma 14 parametru, kaip statybos imonese ivertinti partnerystes santykius. Remdamiesi šiais parametrais, statybos imoniu ekspertai pagal penkiabale sistema ivertina imones santykius su keturiais jos mikroaplinkoje veikiančiais partneriais. Santykius apibūdinantys parametrai naudojami kaip vertinimo kriterijai. Geriausios statybos imones pasirinkimas bendradarbiavimui – daugiakriterinis klausimas. Autores pateiktas sprendimas pagristas ELECTRE III metodu. Ji nagrineja du alternatyvius metodus, kaip geriausia statybos imone pasirinkti išanalizavus partnerystes santykius tarp nagrinejamu statybos imoniu ir mikroaplinkoje veikiančiu ju partneriu. Vienam metodui ji teike pirmenybe. Abu metodai papildo statybos imones sprendimu priemimo sistema, kai reikia pasirinkti subrangova. Imoneje sprendimus priimantis asmuo reikiamus skaičiavimus gali atlikti naudodamasis ConRel programa, parengta Krokuvos technologijos universitete. |
- About this
data sheet - Reference-ID
10363079 - Published on:
12/08/2019 - Last updated on:
12/08/2019