A methodology for scheduling overlapped design activities based on dependency information
Author(s): |
Issam M. Srour
Mohamed-Asem U. Abdul-Malak Ali A. Yassine Maysaa Ramadan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, January 2013, v. 29 |
Page(s): | 1-11 |
DOI: | 10.1016/j.autcon.2012.08.001 |
- About this
data sheet - Reference-ID
10190138 - Published on:
10/12/2018 - Last updated on:
10/12/2018