0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A methodology for prioritizing water mains rehabilitation in Egypt

Author(s):


Medium: journal article
Language(s): English
Published in: HBRC Journal, , n. 1, v. 11
Page(s): 114-128
DOI: 10.1016/j.hbrcj.2014.03.002
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.hbrcj.2014.03.002.
  • About this
    data sheet
  • Reference-ID
    10324293
  • Published on:
    13/07/2019
  • Last updated on:
    13/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine