0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Innovation, , n. 1, v. 16
Page(s): 81-110
DOI: 10.1108/ci-06-2015-0035
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ci-06-2015-0035.
  • About this
    data sheet
  • Reference-ID
    10325323
  • Published on:
    22/07/2019
  • Last updated on:
    22/07/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine