0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Methodology for Analyzing Ranges of Uncertain Model Parameters and Their Impact on Total Maximum Daily Load Process

Author(s): (PhD Candidate, School of Civil and Environmental Engineering, Cornell Univ., Ithaca, NY 14853; presently, Project Manager, Quantitative Environmental Analysis, LLC, 800 Brazos St., Ste. 1040, Austin, TX 78701.)
(J. P. Ripley Professor, School of Civil and Environmental Engineering, Cornell Univ., Ithaca, NY 14853.)
Medium: journal article
Language(s): English
Published in: Journal of Environmental Engineering (ASCE), , n. 6, v. 130
Page(s): 648-656
DOI: 10.1061/(asce)0733-9372(2004)130:6(648)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-9372(2004)130:6(648).
  • About this
    data sheet
  • Reference-ID
    10583807
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine