0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A method to evaluate credit risk for banks under PPP project finance

Author(s):



Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management, , n. 2, v. 27
Page(s): 483-501
DOI: 10.1108/ecam-06-2018-0247
Abstract:

Purpose

The purpose of this paper is to provide a method that can better evaluate the credit risk (CR) under PPP project finance.

Design/methodology/approach

The principle to evaluate the CR of PPP projects is to calculate three critical indicators: the default probability (DP), the recovery rate (RR) and the exposure at default (EAD). The RR is determined by qualitative analysis according to Standard & Poor’s Recovery Scale, and the EAD is estimated by NPV analysis. The estimation of the DP is the focus of CR assessment because the future cash flow is not certain, and there are no trading records and market data that can be used to evaluate the credit condition of PPP projects before financial close. The modified CreditMetrics model and Monte Carlo simulation are applied to evaluate the DP, and the application is illustrated by a PPP project finance case.

Findings

First, the proposed method can evaluate the influence of the project’s cash flow uncertainty on the potential loss of the bank. Second, instead of outputting a certain default loss value, the method can derive an interval of the potential loss for the bank. Third, the method can effectively analyze how different repayment schedules and risk preference of banks influence the evaluating result.

Originality/value

The proposed method offers an approach for the bank to value the CR under PPP project finance. The method took into consideration of the uncertainty and other characteristics of PPP project finance, adopted and improved the CreditMetrics model, and provided a possible loss range under different project cash flow volatilities through interval estimation under certain confident level. In addition, the bank’s risk preference is considered in the CR evaluating method proposed in this study where the bank’s risk preference is first investigated in the CR evaluating process of PPP project finance.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-06-2018-0247.
  • About this
    data sheet
  • Reference-ID
    10576797
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine