0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Method of Removing Rock under Water, as Adopted in the Enlargement and Deepening of the Harbour and Entrance Channel to the Welland Canal at Port Colborne

Author(s):
Medium: journal article
Language(s): English
Published in: Minutes of the Proceedings of the Institution of Civil Engineers, , n. 1885-2, v. 80
Page(s): 232-235
DOI: 10.1680/imotp.1885.21471
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/imotp.1885.21471.
  • About this
    data sheet
  • Reference-ID
    10184719
  • Published on:
    02/01/2019
  • Last updated on:
    02/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine