0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A Memetic Algorithm for the Solution of the Resource Leveling Problem

This publication lists 67 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10753925
  • Published on:
    14/01/2024
  • Last updated on:
    07/02/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine