0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mechanism and countermeasures of preceding tunnel distortion induced by succeeding EPBS tunnelling in close proximity

Author(s):


Medium: journal article
Language(s): English
Published in: Computers and Geotechnics, , v. 66
Page(s): 53-65
DOI: 10.1016/j.compgeo.2015.01.008
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.compgeo.2015.01.008.
  • About this
    data sheet
  • Reference-ID
    10676044
  • Published on:
    02/06/2022
  • Last updated on:
    02/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine