Measuring cash flow and overdraft for fuzzy project networks with overlapping activities
Author(s): |
Min-Chun Yu
Hui-Chung Yeh Van-Loi Dang |
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, April 2017, n. 4, v. 23 |
Page(s): | 487-498 |
DOI: | 10.3846/13923730.2016.1210215 |
Abstract: |
Overlapping activities with imprecise durations to accelerate schedules has an impact on scheduling a conÂstruction project. The project may need to be rescheduled to suit the available overdraft limitation rather than to adopt the least total cost schedule. However, past research has seldom conducted a risk analysis on the project cash flow and overdraft requirements for projects with overlapping activities in a fuzzy environment. This research uses fuzzy DSM-based scheduling and proposes an algorithm to calculate the cash flow and overdraft at different risk levels. A numerical example is illustrated to demonstrate the algorithm’s effectiveness. |
- About this
data sheet - Reference-ID
10354298 - Published on:
13/08/2019 - Last updated on:
13/08/2019