0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Measuring cash flow and overdraft for fuzzy project networks with overlapping activities

Author(s):


Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 4, v. 23
Page(s): 487-498
DOI: 10.3846/13923730.2016.1210215
Abstract:

Overlapping activities with imprecise durations to accelerate schedules has an impact on scheduling a con­struction project. The project may need to be rescheduled to suit the available overdraft limitation rather than to adopt the least total cost schedule. However, past research has seldom conducted a risk analysis on the project cash flow and overdraft requirements for projects with overlapping activities in a fuzzy environment. This research uses fuzzy DSM-based scheduling and proposes an algorithm to calculate the cash flow and overdraft at different risk levels. A numerical example is illustrated to demonstrate the algorithm’s effectiveness.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2016.1210215.
  • About this
    data sheet
  • Reference-ID
    10354298
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine