Materials management at the Gotthard Base Tunnel - experience from 15 years of construction / Materialbewirtschaftung am Gotthard-Basistunnel - Erkenntnisse aus 15 Jahren Ausführung
Author(s): |
R. H. Lieb
|
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2009, n. 5, v. 2 |
Page(s): | 619-626 |
DOI: | 10.1002/geot.200900032 |
Abstract: |
The management of the handling of approximately 25 m tonnes of spoil material from the Gotthard Base Tunnel was and still is an enormous challenge. A permit system for concrete mixes and continuous testing of the excavated raw material and the grading of the broken rock ensure that as much spoil material as possible can be reused for the production of high-quality concretes and shotcretes for the construction of the tunnel. |
Keywords: |
tunnel excavation material recycling re-use
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10063828 - Published on:
19/11/2010 - Last updated on:
13/08/2014