Materials management at the Gotthard Base Tunnel - experience from 15 years of construction / Materialbewirtschaftung am Gotthard-Basistunnel - Erkenntnisse aus 15 Jahren Ausführung

Author(s):
Medium: journal article
Language(s): English, German
Published in: Geomechanics and Tunnelling, , n. 5, v. 2
Page(s): 619-626
DOI: 10.1002/geot.200900032
Abstract:

The management of the handling of approximately 25 m tonnes of spoil material from the Gotthard Base Tunnel was and still is an enormous challenge. A permit system for concrete mixes and continuous testing of the excavated raw material and the grading of the broken rock ensure that as much spoil material as possible can be reused for the production of high-quality concretes and shotcretes for the construction of the tunnel.

Keywords:
tunnel excavation material recycling re-use
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/geot.200900032.
  • About this
    data sheet
  • Reference-ID
    10063828
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine