0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Material Transshipment for Precast Fabrication

Author(s):
Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 3, v. 19
Page(s): 335-347
DOI: 10.3846/13923730.2012.744771
Abstract:

Materials required for precast fabrication are dissimilar to those cast at construction sites. Fabricators who lack materials must wait until specific suppliers deliver the required materials. The objective of this study is to reduce total material management costs in the supply chain system through the most advantageous transshipment strategies. A material supply chain framework that enables fabricators to implement lateral transshipment is first proposed. Transshipment strategies are then formulated into a mathematical model. The most advantageous transshipment strategies are analyzed using computer simulation. Diverse order lead times, demands, transportation costs, and shortage costs are simulated to approximate operational conditions encountered in supply chain systems. Through various experiments, the most advantageous strategy for precast fabrication industry can be found. In addition, four rules are developed based on simulation results to enhance transshipment decision making. This research is one of the pioneering studies applying lateral transshipment to precast production management.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2012.744771.
  • About this
    data sheet
  • Reference-ID
    10362890
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine