0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mapping out BIM Contract Conditions by Way of a Comparative Study

Author(s): (Principal Lecturer, Div. of Building Science and Technology, City Univ. of Hong Kong, Hong Kong SAR, PR China; formerly, Chairman (2005–2006), Quantity Surveying Div., Hong Kong Institute of Surveyors, Sheung Wan, Hong Kong.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 13
Page(s): 05020017
DOI: 10.1061/(asce)la.1943-4170.0000446
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000446.
  • About this
    data sheet
  • Reference-ID
    10580077
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine