Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis
Author(s): |
Youxi Zhang
Yu Liu Rui Yu Jian Zuo Na Dong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-04-2023-0392 |
- About this
data sheet - Reference-ID
10738915 - Published on:
03/09/2023 - Last updated on:
03/09/2023