Managing pile foundation and land cost for high-rise buildings in the early design stages
Author(s): |
Tam Nguyen Van
Trung Nguyen Hieu Frank De Troyer |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Architectural Engineering and Design Management, March 2016, n. 3, v. 12 |
Page(s): | 151-169 |
DOI: | 10.1080/17452007.2016.1140016 |
- About this
data sheet - Reference-ID
10301796 - Published on:
28/02/2019 - Last updated on:
28/02/2019