0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Major Construction Delay Factors of Jordan, UAE, Pakistan and Sri Lanka

Author(s):
Medium: journal article
Language(s): English
Published in: International Journal of Architecture Engineering and Construction, , n. 4, v. 6
DOI: 10.7492/ijaec.2017.020

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.7492/ijaec.2017.020.
  • About this
    data sheet
  • Reference-ID
    10378096
  • Published on:
    10/11/2019
  • Last updated on:
    10/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine