Major Construction Delay Factors in Portugal, the UK, and the US
Author(s): |
Yue Choong Kog
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Practice Periodical on Structural Design and Construction, November 2018, n. 4, v. 23 |
Page(s): | 04018024 |
DOI: | 10.1061/(asce)sc.1943-5576.0000389 |
- About this
data sheet - Reference-ID
10232595 - Published on:
02/12/2018 - Last updated on:
02/12/2018