0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Major Causes of Construction Delays Identified Using the Delphi Technique: Perspectives of Contractors and Consultants in Thailand

This publication lists 37 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10446816
  • Published on:
    19/10/2020
  • Last updated on:
    20/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine