0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Main Risk Factors Causing Delays in GAP Construction Projects in Turkey by Using Relative Importance Index (RII) Method

This publication lists 48 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10735559
  • Published on:
    03/09/2023
  • Last updated on:
    20/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine