0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Maglev Guideway Cost and Construction Schedule Assessment

Author(s): (Civ. and Railway Engr., U.S. Army Constr. Engrg. Res. Lab., P.O. Box 9005, Champaign, IL 61826-9005.)
(Div. Chf., Maintenance Mgmt. and Preservation Div. (FL-P), U.S. Army Constr. Engrg. Res. Lab., P.O. Box 9005, Champaign, IL.)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 3, v. 123
Page(s): 195-198
DOI: 10.1061/(asce)0733-947x(1997)123:3(195)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(1997)123:3(195).
  • About this
    data sheet
  • Reference-ID
    10633913
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine