Maglev Guideway Cost and Construction Schedule Assessment
Author(s): |
Don Plotkin
(Civ. and Railway Engr., U.S. Army Constr. Engrg. Res. Lab., P.O. Box 9005, Champaign, IL 61826-9005.)
Simon Kim (Div. Chf., Maintenance Mgmt. and Preservation Div. (FL-P), U.S. Army Constr. Engrg. Res. Lab., P.O. Box 9005, Champaign, IL.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Transportation Engineering, May 1997, n. 3, v. 123 |
Page(s): | 195-198 |
DOI: | 10.1061/(asce)0733-947x(1997)123:3(195) |
- About this
data sheet - Reference-ID
10633913 - Published on:
29/11/2021 - Last updated on:
29/11/2021