0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Machine learning-aided engineering services' cost overruns prediction in high-rise residential building projects: Application of random forest regression

This publication lists 96 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10655778
  • Published on:
    17/02/2022
  • Last updated on:
    21/02/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine