0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The LP/IP hybrid method for construction time-cost trade-off analysis

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 3, v. 14
Page(s): 265-276
DOI: 10.1080/014461996373511
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/014461996373511.
  • About this
    data sheet
  • Reference-ID
    10213059
  • Published on:
    04/12/2018
  • Last updated on:
    04/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine