Lost in transition: the transfer of lean manufacturing to construction
Author(s): |
Bo Jørgensen
Stephen Emmitt |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management, July 2008, n. 4, v. 15 |
Page(s): | 383-398 |
DOI: | 10.1108/09699980810886874 |
- About this
data sheet - Reference-ID
10576171 - Published on:
26/02/2021 - Last updated on:
26/02/2021