0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Loss in Productivity in Relation with Delay Analysis in Building Construction Projects

Author(s): (M. E Civil [C & M] SE, MIT College, Pune)

Medium: journal article
Language(s): English
Published in: IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), , n. 3, v. 11
Page(s): 73-80
DOI: 10.9790/1684-11347380
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.9790/1684-11347380.
  • About this
    data sheet
  • Reference-ID
    10672225
  • Published on:
    03/06/2022
  • Last updated on:
    16/10/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine