0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Long-term performance prediction of ground source heat pump system based on co-simulation and artificial neural network

Author(s):


ORCID
Medium: journal article
Language(s): English
Published in: Journal of Building Engineering, , v. 79
Page(s): 107949
DOI: 10.1016/j.jobe.2023.107949
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.jobe.2023.107949.
  • About this
    data sheet
  • Reference-ID
    10757157
  • Published on:
    14/01/2024
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine