0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The long path to approval of the Semmering Base Tunnel and the effect on construction progress / Der lange Weg zur Genehmigung des Semmering-Basistunnels und Auswirkungen auf den Bauablauf

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10072783
  • Published on:
    29/01/2016
  • Last updated on:
    29/01/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine