Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs
Author(s): |
Zahra Sadat Moussavi Nadoushani
Ahmed W. A. Hammad Ali Akbarnezhad |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2017, n. 1, v. 143 |
Page(s): | 04016089 |
DOI: | 10.1061/(asce)co.1943-7862.0001215 |
- About this
data sheet - Reference-ID
10170913 - Published on:
02/12/2018 - Last updated on:
02/12/2018