0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Location Allocation of Sugar Beet Piling Centers Using GIS and Optimization

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Infrastructures, , n. 2, v. 4
Page(s): 17
DOI: 10.3390/infrastructures4020017
Abstract:

The sugar beet is one of the most important crops for both social and economic reasons, even though the area under sugar beet cultivation in the Red River valley of North Dakota and Minnesota is comparatively smaller that of corn and other crop lands. It generates a large economic activity in local and regional level with a greater impact on jobs and stimulation of agriculture, transportation, and farm economy. Sugar beet transportation takes place in two stages in Red River Valley: the first step is from farms to piling centers (pilers) and the second step from pilers to processing facilities. This study focuses on the problem of optimizing piler locations based on supply variation. Sugar beet supply and harvest varies significantly due to numerous reasons such as weather, water availability, and different maturity dates for the crop. This provides for a variable optimal harvesting time based on the plant maturity and sugar content. Sub-optimized pilers location result in the high transportation and utilization costs. The objective of this study is to minimize the sum of transportation costs to and from pilers and the pilers utilization cost. A two-step algorithm based on the geographical information system (GIS) with global optimization method is used to solve this problem. This method will also be useful for infrastructure decision makers such as planners and engineers to predict the truck volume on rural roads.

License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10723301
  • Published on:
    22/04/2023
  • Last updated on:
    10/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine