The Load-sharing ratio of prebored and precast pile in top-down method construction process
Author(s): |
Dohyun Kim
Sangseom Jeong Gyungja Jung Jongjeon Park |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Structural Design of Tall and Special Buildings, July 2018, n. 10, v. 27 |
Page(s): | e1472 |
DOI: | 10.1002/tal.1472 |
- About this
data sheet - Reference-ID
10081162 - Published on:
09/10/2018 - Last updated on:
09/10/2018