0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Life cycle cost of different Walling material used for affordable housing in tropics

Author(s):

Medium: journal article
Language(s): English
Published in: Case Studies in Construction Materials, , v. 7
Page(s): 15-29
DOI: 10.1016/j.cscm.2017.04.005
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.cscm.2017.04.005.
  • About this
    data sheet
  • Reference-ID
    10577237
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine